Skip to navigation Skip to main content

Steel Frame Up at Congleton Leisure Centre

3
Dec '21

It was fantastic to be up in Congleton to see the progress on site for our project with Pulse Design and Build.

The steel frame is nearly finished with roof, cladding and precast floors and stairs to go in before works start on the RC pool structure and ground floor slabs.